BRANCH TOYOTA: FROM OLD TO NEW

 

 

STAY TUNED TO WATCH THE OLD SHOWROOM GET DEMOLISHED AND OUR NEW STATE OF THE ART SHOW ROOM BE CONSTRUCTED!

 

WHILE WE ARE UNDER CONSTRUCTION PLEASE FIND US IN THE REAR OF THE PARKING LOT IN THE SALES TRAILOR.  WE ARE OPEN FOR BUSINESS AND OUR VEHICLES ARE PRICED TO SELL BECAUSE WE NEED TO MAKE ROOM FOR THE NEW SHOWROOM!

 

The Beginnings of our New Service Department: New Bays and Equipment to better serve our customers!!

 

 Pouring the Foundation to our Expanded Service Department

 

Floor Is Poured 

The Machines that have just arrived to knock down the Old Building!!

 

 

Preparing for Demolition Tomorrow

 

 

Our Old Showroom on the Ground!!

 

 

 

WORKING ON THE TWO LANE SERVICE DRIVE

 

 

OLD SHOWROOM COMPLETELY ON THE GROUND

 

SERVICE WALLS BEING CONSTRUCTED

 

OUR NEW SALES HOME

 

 

The Wall of the New Service Department

 

 

Stone Wall Almost Finished

 

 

Progress on the Stone Wall

 

 

Finishing Touches on the Rock Wall

 

 

Where Our Old Showroom was Located

 

 

STONE WALL COMPLETE

 

 

The New Service Bays

 

The New Service and Parts Home Until the Construction is Finished

 

 

Laying the Footings for the New Showroom

 

 

The Cement Truck

Pouring the First Portion of the Foundation

 

Preparing to Pour the Walls of the New Showroom

 

 

Finishing Touches on the Foundation

 

The Finished Foundation

 

The Beginning of the All New Showroom - Laying the Steel

 

 The Front Portal of the New Showroom Being Put in Place

 

Steel Work

 

The Finished Portal and the Start of the Roof

 

Working Towards the Finished Product

 

Leveling the Bottom Floor

 

Snap shots of the Second Floor

 

The Grids Are Down... Getting Ready to Pour the First Floor

 

The First Floor Being Poured with Cement

 

First Floor Poured

Framing the Top Floor

Framing Upstairs

Framing Upstairs 2

 

Framing Upstairs 3

 

Framing Upstairs 4

Framing Upstairs 5

 

Framing Upstairs 6

BOTTOM FLOOR BEING FRAMED AND INSULATED

HEATING AND AIR CONDITIONING ARRIVED

AND THE FRAMING CONTINUES AND SOME DRY WALL IS BEING MOUNTED

The Sheet Rocking Begins

Framing For the Windows

WINDOWS BEING PUT IN PLACE

Windows Installed

Front Windows Complete

Dry Walling Complete\

Front Entrance Being Framed

Getting Ready for the Siding

Exterior Walls Being Preped

New Garage Doors

Electric and Lighting

Scion Section Tiled

Elevator Installed

Showroom Ceiling

Upstairs Floors Being Finished

Front Panel of Buidling Revealed

Our Sign Has Arrived

Lunch Room Tiled

Tile Downstairs

Scion Pillar

Scion Station

Scion Seating

Beginning of the Heated Side Walk

SHOWROOM MURAL

 

THE TOYOTA TIMELINE

 

Scion Sign

 

Front Enterance

Opening Morning In Scion

 

Opening Morning In the Toyota Showroom

 

Outside of Delivery Area

Delivery Area Inside