Branch Toyota
- New:
- 866-879-4106
- Used:
- 866-879-4106
- Parts:
- 866-884-2495
- Service:
- 866-889-5997
- Contact Us Now:
- 866-879-4106
BRANCH TOYOTA: FROM OLD TO NEW

STAY TUNED TO WATCH THE OLD SHOWROOM GET DEMOLISHED AND OUR NEW STATE OF THE ART SHOW ROOM BE CONSTRUCTED!

WHILE WE ARE UNDER CONSTRUCTION PLEASE FIND US IN THE REAR OF THE PARKING LOT IN THE SALES TRAILOR. WE ARE OPEN FOR BUSINESS AND OUR VEHICLES ARE PRICED TO SELL BECAUSE WE NEED TO MAKE ROOM FOR THE NEW SHOWROOM!
The Beginnings of our New Service Department: New Bays and Equipment to better serve our customers!!

Pouring the Foundation to our Expanded Service Department

Floor Is Poured

The Machines that have just arrived to knock down the Old Building!!


Preparing for Demolition Tomorrow



Our Old Showroom on the Ground!!






WORKING ON THE TWO LANE SERVICE DRIVE

OLD SHOWROOM COMPLETELY ON THE GROUND



SERVICE WALLS BEING CONSTRUCTED

OUR NEW SALES HOME

The Wall of the New Service Department

Stone Wall Almost Finished

Progress on the Stone Wall

Finishing Touches on the Rock Wall

Where Our Old Showroom was Located


STONE WALL COMPLETE

The New Service Bays


The New Service and Parts Home Until the Construction is Finished

Laying the Footings for the New Showroom


The Cement Truck

Pouring the First Portion of the Foundation



Preparing to Pour the Walls of the New Showroom


Finishing Touches on the Foundation



The Finished Foundation

The Beginning of the All New Showroom - Laying the Steel


The Front Portal of the New Showroom Being Put in Place



Steel Work


The Finished Portal and the Start of the Roof

Working Towards the Finished Product



Leveling the Bottom Floor


Snap shots of the Second Floor


The Grids Are Down... Getting Ready to Pour the First Floor

The First Floor Being Poured with Cement

First Floor Poured

Framing the Top Floor






BOTTOM FLOOR BEING FRAMED AND INSULATED





HEATING AND AIR CONDITIONING ARRIVED

AND THE FRAMING CONTINUES AND SOME DRY WALL IS BEING MOUNTED



The Sheet Rocking Begins


Framing For the Windows

WINDOWS BEING PUT IN PLACE


Windows Installed


Front Windows Complete


Dry Walling Complete\

Front Entrance Being Framed

Getting Ready for the Siding

Exterior Walls Being Preped

New Garage Doors

Electric and Lighting

Scion Section Tiled

Elevator Installed

Showroom Ceiling

Upstairs Floors Being Finished

Front Panel of Buidling Revealed

Our Sign Has Arrived



Lunch Room Tiled

Tile Downstairs

Scion Pillar

Scion Station

Scion Seating

Beginning of the Heated Side Walk

SHOWROOM MURAL

THE TOYOTA TIMELINE

Scion Sign

Front Enterance

Opening Morning In Scion

Opening Morning In the Toyota Showroom

Outside of Delivery Area

Delivery Area Inside

